Description
The case is about the HPV vaccine factory.
As the MEP general contractor, Tofflon Dehui completed design optimization, BIM design, and the procurement, installation, commissioning and China GMP validation of equipment and materials in cleanroom and other scope.
Construction area: 18000 ㎡
Purification area: 14000 ㎡
Previous
Previous